Preliminary Biomass Feedstock Assessment and Feasibility Study for a Biomass/Cogen Facility


Project Report (3.5 MB)

Appendix A: Bibliographic References (24 kB)

Appendix B: Feedstock Generation Multipliers and Conversion Factors (70.7 kB)

Appendix C: Conceptual Engineering and Technical Documents (1.2 MB)

Appendix D: CCI Newmarket Facility Tour Photos (1.5 MB)

Appendix E: Option 1 Equipment List and Preliminary Capital Cost Estimate (16.2 kB)

Appendix F: Option 2 Equipment List and Preliminary Capital Cost Estimate (16.7 kB)

Appendix G: Option 3 Equipment List and Preliminary Capital Cost Estimate (16.5 kB)

Appendix H: Option 4 Equipment List and Preliminary Capital Cost Estimate (16.4 kB)

Appendix I: Preliminary Operational Cost Estimates (18.6 kB)

Appendix J: Applicable Cost Standards and Permit Documents (32.1 kB)

Appendix K: Non SERBEP States Animal Manure Feedstock Estimates (5.8 kB)

Appendix L: Top 25 Food Manufacturing Counties by Industry Type (9.4 kB)

Appendix M: South Carolina and SERBEP Region Landfills and MRFs (32.7 kB)

Appendix N: DOE Natural Gas Consumption Forecast (644 kB)

Appendix O: DOE SERBEP States Natural Gas Pricing for Industrial and Comerical (4.6 kB)

Appendix P: DOE SERBEP States Electricity Pricing Data (2.7 MB)

Appendix Q: Option 1 Ten Year Cash Flow Financial Analysis Fromat Example (26.9 kB)

Appendix R: Public and Private Grant Programs and Funding Sources (60 kB)

Appendix S: Engineering Execution Plan (11.9 kB)